Author(s): Jun Wang; Chengjun Peng
Linked Author(s): Jun Wang
Keywords: Underground powerhouse; Safety monitoring; Surrounding rock deformation; Stress
Abstract: To make inverse analysis on safety monitoring results in the design and construction of large-scale underground chambers can timely master the changes of the surrounding rocks, understand the stress condition of supporting structure, and provide evidences for project construction quality evaluation and danger diagnosis. The analysis can also make a full use of the monitoring results to constantly optimize construction scheme and enhance economic performance. At the same time, it can also verify design rationality and ensure the construction and operation safety of underground chambers.
Year: 2013