Tucurui Hydroelectric Power Station Water Level Forecasts During the Second Phase Diversion at the Time of the Exceptional 1980 Floods

Author(s): Jander Duarte Campos; Eduardo Freitas Madeira; Marco Augusto Siciliano; Oswaldo Valadao Silveira

Linked Author(s):

Keywords: Tucuruihydroelectric power station (HPS); Forecasts of flows and water levels; Flood during the construction of the power station

Abstract: During the first stage of the construction of the TucuruiHydroelectric Power Station in the Tocantins river, State of Minas Gerais, Brazil, forecast studies contributed to take in time the actions necessary to minimize the effects of the great flood occurred in 1980 in the Tocantins river basin, assuring security for the personnel involved as well as preservation of works and equipment of the plant.

DOI:

Year: 2002

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions