Sediment Research for the Three Gorges Project on the Yangtze River Since 1993

Author(s): Bingnan Lin; Ren Zhang; Dingzhong Dai; Ying Tan

Linked Author(s): Dingzhong Dai

Keywords: Three Gorges Project; Sediment load; Reservoir sedimentation; River degradation

Abstract: This article addresses sediment research carried out for the Three Gorges Project since 1993, when the construction of the Project was formally started. Emphasis of the research has been placed on the solution of relevant problems arising from design and construction of various structures, including sedimentation problems in the Chongqing reach; layout of the upper lock approach channel and ways and means to mitigate its deposition; increasing reservoir capacity by optimizing reservoir operation; compensating depth of flow required by navigation below the Gezhouba Project caused by scouring; mitigation of adverse effects of erosion on the reach from Zhicheng to Jiangkou; and evaluating scour of the Jinjiang reach caused by releasing flows of low concentrations from TGP. In addition, reduction of the sediment load entering into the reservoir area of TGP in the recent years as well as that expected of the projected construction of large hydropower stations on the Jinsha River upstream of the TGP reservoir is also noted and discussed.

DOI:

Year: 2004

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions