Lessons-To-Be-Learned from Oroville Dam Spillway Incident

Author(s): P. E. P. Schweiger

Linked Author(s):

Keywords: No Keywords

Abstract: In early February 2017, the tallest dam in the United States made international news when its service spillway began to experience problems, and live video footage showing chunks of concrete from the spillway structure being hurled in the air as the spillway disintegrated from high velocity flows. In response to this emergency, an immediate decision was made to discontinue using the service spillway by shutting the crest gates and allowing the reservoir to rise and activate the adjacent auxiliary (emergency) spillway for the first time in the project’s 50-year history. This action led to unexpected severe and rapid erosion and deep head-cutting of the terrain immediately downstream of the emergency spillway control structure, threatening control structure stability, and resulting in the precautionary evacuation of approximately 188,000 downstream residents. Since the occurrence of this event, hundreds of millions of dollars have been spent to implement emergency repairs to both spillways. The repairs to the spillways involve the implementation of state-of-the-practice fast-tracked designs using physical and numerical model studies and extensive onsite investigations. Cutting-edge construction techniques are being employed on a massive scale including the use of secant pile cutoff walls and high-strength roller-compacted concrete. Concurrent with the emergency spillway repairs, an Independent Forensic Team (IFT) of expert engineers was engaged to complete a thorough investigation of the incident and report on the chain of conditions, actions, and inactions for various stages of the project (pre-design, design, construction, operations and maintenance) that resulted in the damage to the spillways. The IFT’s report was released on January 5,2018 and provides important insights and lessons to be learned from this incident, with an emphasis on understanding the human factors and several important industry-level lessons that apply to dam safety practice in the United States.

DOI: https://doi.org/10.15142/T3SS8F

Year: 2018

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions