DONATE

IAHR Document Library


« Back to Library Homepage « Proceedings of the 29th IAHR World Congress (Beijing, 2001)

Development and Practice of a New Type Dissipator in Geheyan Project

Author(s): Wang Caihuan; Huang Guobing; Chen Yuanming

Linked Author(s):

Keywords: High arch dams; Flood relief; Flaring gate pier; Stillingbasin; Energy dissipation and scour protection

Abstract: For the flood relief and energy dissipation characteristics of the Geheyan Project, the basic ways of energy dissipation and scour protection were studied, and the new type dissipater-combined dissipation of asymmetric flaring piers and a stilling basin was developed. This made thatch difficult problem of flood relief and energy dissipation of a high arch dam built on a narrow river channel had been solved. The successful experiences from this project can be used in conducting the energy dissipation and scour protection design of other high arch dams.

DOI:

Year: 2001

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions