DONATE

IAHR Document Library


« Back to Library Homepage « Proceedings of the 33rd IAHR World Congress (Vancouver, 2009...

The Resuscitation of a Shriveled River -- -- Effects of Initial Operation of the Xiaolangdi Hydro-Project on Erosion of the Lower Yellow River

Author(s): Chen Jian-Guo; Zhou Wen-Hao; Sun Ping

Linked Author(s): Jianguo Chen

Keywords: Reservoir sedimentation; Shriveled river; Channel erosion; Channelresuscitation; Water and sediment regulation

Abstract: The Xiaolangdi Hydro-project is another large project below the famous Sanmenxia Project. Its reservoir was impounded in Oct., 1999. Since then, the conditions of incoming runoff and sediment of the Lower Yellow River have been changed. The channel has been transformed from aggradation into degradation. The flood conveying capacity has been increased by 25-74%. Now, the channel erosion is still going on. The fact proves that the shrunk Lower Yellow River could be resuscitated its vigor through the reasonable regulation of water and sediment by the reservoir.

DOI:

Year: 2009