Author(s): C. Naish; C. A. M. E. Wilson
Linked Author(s):
Keywords: No Keywords
Abstract: The construction of a major trunk road along the River Blackwater valley in Hampshire has resulted in the need to relocate a length of the River Blackwater This gave the National Rivers Authority an opportunity to construct and study the hydraulic performance of an environmentally acceptable, doubly meandering, two-stage channel.
Year: 1995