Author(s): Guifen Li; Difang Xiao
Linked Author(s):
Keywords: No Keywords
Abstract: An optimized regulation scheme for operation of Xigou Hydropower Plant during ice period is discussed in this paper. The scheme presented herein can not only keep the economic benefits, but also resolve the problem of downstream ice flood.
Year: 2000