Author(s): Bomeng Xu; Shenqing Yu; Xingliang Lu
Linked Author(s):
Keywords: No Keywords
Abstract: In Jan. and Feb. 1987, during repairing of the highway bridge above Nenjiang River, ice cover was used for transport and traffic. This paper introduces the ice road choosing and layout, maintenance during its openning traffic and transport control, the results of in-situ observation.
Year: 1990