Author(s): Tran Quoc Thuong; Pham Anh Tuan; Tran Vu
Linked Author(s):
Keywords:
Abstract: Spillway of Bung 4 river hydropower project has high specific discharge capacity with meandering flow, road and local people living in downstream. Therefore, it is necessary to conduct hydraulic physical model test for selecting type of structure of flip bucket in order to reduce scouring and protecting the downstream. The paper is to present briefly experimental research of the discontinuous flip bucket that applied for spillway of Bung 4 river hydropower project in Quang Nam province.
Year: 2014