DONATE

IAHR Document Library


« Back to Library Homepage « Proceedings of the 2nd Symposium on Flood Defence (Beijing, ...

Application of Construction Technique of Thin Diaphragm Wall by Grab-Drill Excavating Trench Process in Seepage Control of the Dike Foundation of Yangtze River

Author(s): Jinjie Zhang

Linked Author(s):

Keywords: Grab-drill excavating trench process; Thin diaphragm; Excavating trench; Ogee joint

Abstract: In this paper, the performance of GDW-3 excavating special machine is introduced briefly, and the application of the construction technique for thin diaphragm wall by grab-drill excavating trench process with rope grab is systematically discussed. It has been testified that the GDW-3 excavating machine for thin diaphragm wall has preferable cost performance in many practical engineering, especially in Qiuwan dike section in Hubei province, which is the one of most complicate anti-seepage embankment in China. Under the complicated geological stratum conditions, the technique of thin diaphragm wall by grab-drill excavating trench process with light grab excavator should be recommended, which can be taken as supplement for the method of excavating trench by directly grab excavating process. Ogee joint used to connect with thin trench segment is feasible at site, which can save cost and time in junction treatment.

DOI:

Year: 2002

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions