Two-Dimensional Hydraulic Model for Reservoir Sediment Flushing Studies

Author(s): Guillermo Q. Tabios Iii; Carlo J. Mondonedo

Linked Author(s):

Keywords: Reservoir sedimentation; Sediment flushing operations; Two-dimensional model; Finite volume method; Simulation studies

Abstract: This paper presents a two-dimensional hydraulic model using the finite volume method for reservoir sediment flushing studies. The hydraulic equations used are the depth-integrated conservation equations of mass, momentum (longitudinal and transverse), suspended sediment, and total sediment. In the finite volume method, the mass, momentum, and suspended sediment fluxes of the conservation equations are calculated for each side of a finite volume based on an approximate Riemann problem solution. The Riemann problem solution involves approximating the fluxes by the characteristic solution of the governing equations. To solve the total sediment conservation equation, similar fluxes are calculated using the Ackers-White sediment transport equation. The reservoir sediment-flow model is applied to the Pulangi Reservoir in Bukidnon, Philippines for sediment flushing studies. Two simulation scenarios have been performed. The first simulation scenario is the case with no sediment flushing operation in the reservoir for a total simulation period of 200 hours (8. 3 days). The second simulation scenario is with sediment flushing operation started at the beginning of 121 hours for the next 48 hours. In this second scenario, the sediment flushing sluiceway gate was opened up to 1. 0 meter and the gate opening and closing operations were accomplished in 1 hour. The simulation results indicate that sediment flushing operations over a 48 hour period can scour the reservoir bed to as deep as 2. 5 meters in the vicinity of flushing sluiceway. Over 29, 000 cubic meters of sediment is removed during this period (based on resulting bed elevations with and without sediment flushing). This is with 1. 0 meter sluiceway gate opening and associated discharge of 250 CMS. Reservoir elevation is about 281 meters at the damsite and reservoir inflow ranges from 85 to 100 CMS. This is a moderate hydraulic condition for flushing operations since reservoir historical inflows can be over 270 CMS and water elevations as high as 285 m. It is concluded that flushing operations is effective and especially when scheduled during periods of high flows and subsequently high reservoir elevations without compromising hydropower generation.

DOI:

Year: 2005

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions