Dispatching Operation Schemes of the Three Gorges Project in Cofferdam Impoundment Period

Author(s): Huichao Dai; Wenshe He

Linked Author(s):

Keywords: Cofferdam impoundment period; TGP; Gezhouba Project; Cascade dispatching; Operation schemes

Abstract: After analyzing the progress of construction of the Three Gorges Project (TGP) and the demands of related departments for unite dispatching operation of TGP and Gezhouba Project, the reasonable dispatching operation schemes during cofferdam impoundment period were worked out according to the studies on following four aspects: construction of flood sluicing structures, safety of cofferdam during flood period in 3rd stage construction, cascade power dispatch and navigation dispatch. Some problems to be studied for the normal operation of TGP are listed in this paper too.

DOI:

Year: 2004

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions