DONATE

IAHR Document Library


« Back to Library Homepage « Proceedings of the 29th IAHR World Congress (Beijing, 2001)

Dam Break Wave with Energy Dissipation: Two Case Studies

Author(s): H. Chanson; S. Aoki

Linked Author(s):

Keywords: Dam break wave; Energy dissipation; Dam overtopping; Steppedcascade

Abstract: Flood waves resulting from dam break and spillway gate malfunction may have dramatic impacts. Two related cases are the overtopping of a dam by flood waves and a sudden water release down a stepped cascade. In each instance, some energy dissipation takes place and classical dam break theory are inappropriate. Both cases were investigated in large-size facilities and in a prototype. New experimental observations are presented. The results highlight a faster wave propagation than predicted by classical theories. The reduced warning time for downstream populations is a major concern and new correlations are proposed to estimate the flood wave arrival.

DOI:

Year: 2001

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions