Author(s): Qiu Xiuyun; Hou Jie; Sun Tao; Zhou Zhu
Linked Author(s):
Keywords: Steep slope bend; Torrent shock waves energy dissipation
Abstract: Kaqun primary water power station takes a measure of connecting suspended dissipator with diversion baffle to eliminate shock waves in steep slope bend. This measure is taken to eliminate energy in the first part of the steep slope mainly, and be connected with dissipation and diversion in bend. A year's actual operation indicates that this measure solves the problem of controlling the flow pattern of big-base-slope-torrent bend well, and the construction methods are easy, the investment of project is small, original structure remains unchanged basically, the project operates well in winter. So the measure can be spread and be applied in other similar projects.
Year: 2001