The Practice of Comprehensive Silt Proof Measures in Tide Power Stations

Author(s): Xiaohua Liu; Liu Fagong

Linked Author(s):

Keywords: Practice; Measures; Tide; Stations; Silt proof

Abstract: Comprehensive management plays an important role in ensuring the normal operation of tide power stations. Effective measures are obtained through a thorough theoretical study and a long-term investigation, which include: 1. Rational project arrangement2. Appropriate operation mode3. All sorts of essential engineering facilities4. Effective mechanical sand-proof methods5. Biological measuresAll these above are the measures widely used in the tide power stations in China along the West Pacific coast and remarkable results have been achieved.

DOI:

Year: 2001