Author(s): By Howard H. Chang
Linked Author(s):
Keywords: No Keywords
Abstract: A numerical modeling study was made to assess sediment delivery and deposition along Silver Bow Creek and the Clark Fork River in Montana. The study was concerned with the delivery and storage of sediment and tailings through the channel reach of about 150 miles, from Butte to the Milltown Reservoir for a time span of 110 years.
Year: 1997