Author(s): A. S. Sokolov
Linked Author(s):
Keywords: No Keywords
Abstract: The problem of providing in winter reliable maintenance of the technical water supply system of NPP with a cooling pond is considered on definite example. To prevent ice impediments in water intake structures a part of water heated by condensers of circulating water is discharged directly into supply canal. As a result of numerical simulation of hydrothermal processes there have been obtained probabilities of ice formation in the cooling pond and determined optimal parameters of water discharge.
Year: 2004