16328 |
A Multivariate Regression Model for Flood-Peak Level Forecasting on the Lower Yellow River |
Keyan Xu; Wei Ren; Li Xie
|
2002 |
16329 |
Flood Forecasting and Warning System in Bangladesh |
A. N. H. Akhtar Hossain
|
2002 |
16330 |
A Flood Forecasting Model for the Beijiang River Below Feilaixia Dam |
Ping Huang; Jing Yang; Yi-Long Zhong
|
2002 |
16331 |
On the Use of Coupled Mesoscale Meteorological and Hydrological Models for Flood Forecasting in Midsize Mountain Catchments: Operational Experience and Verification |
Baldassare Bacchi; Giovanna Grossi; Roberto Ranzi; Andrea Buzzi
|
2002 |
16332 |
Classifier Based Local Artificial Neural Networks Applied to Watershed Runoff Forecasting |
Ling Wang; Jing Gao
|
2002 |
16333 |
Tucurui Hydroelectric Power Station Water Level Forecasts During the Second Phase Diversion at the Time of the Exceptional 1980 Floods |
Jander Duarte Campos; Eduardo Freitas Madeira; Marco Augusto Siciliano; Oswaldo Valadao Silveira
|
2002 |
16334 |
Hourly Flood Forecasting of Chumporn River with a Neural Network Model |
Nophakhun Somsin; Pichaid Varoonchotikul
|
2002 |
16335 |
Regional Flood Analysis in Small Catchments of Central-Alborz |
Salagegheh Ali; Abdollahi Hamid Reza
|
2002 |
16336 |
Researching of High Tidal Level Forecast Method at Ganpu Station in Qiantang Estuar |
Guojian Hu; Shichang Huang; Bingyao Lin; Aiju You
|
2002 |
16337 |
River Stage Real-Time Forecasting in Qiantang Estuary |
Aiju You; Bingyao Lin; Youcheng Xu
|
2002 |